Position: Home » Product List » Railway Tools » TDR2017 Track Dowty Retarder

TDR2017 Track Dowty Retarder

The design of the TDR2017 dowty retarder is based on the performance parameters in accordance with the TB / T2460-93 standard, and the main design is to facilitate installation and maintenance.

Product Recommendation

  • Product Introduction
  • Product Parameter
  • Product Picture
  • Product Comment

Introduction of TDR2017 Track Dowty Retarder

The design of the TDR2017 dowty retarder is based on the performance parameters in accordance with the TB / T2460-93 standard, and the main design is to facilitate installation and maintenance.

Parameter of TDR2017 Track Dowty Retarder

1. Working conditions:

Temperature():-50-+50

Rails Adaptable:43kg/m, 50kg/m, 60kg/m

2. Speed(km/h): 4.5±0.36

3. Braking force(J):970

4. Work of resistance (J): braking forcex5%

5. Vertical reaction(KN):18.5-1.5

6. Oil injection(ml): 400-5

7. Medium oil:10# aircraft hydraulic oil

8. Nitrogen filling pressure (mpa): 0.9

9. Return time (s):<5

10. Installation angle:13°

11. Installation height(mm): 50

12. Structure installation (km/h):25

 

Pictures of TDR2017 Track Dowty Retarder

Your Name

Email or sales@chinacoalintl.com

Tel/Wechat/Whatsapp or +8618660761375

Country

Enquiry bitian